WP3
Implement and test the technical system optimization from solutions established in WP1 and WP2.
This work package will focus on how the overall SysOpt control design do perform online decision making while ensuring grid stability, reliability, and efficiency. The WP3 will implement and test a hardware/software infrastructure for including the new control design, and test the developed SysOpt control design method.
Activities:
- Combine technical solutions in a system optimization
- Implement and validate the technical solution.
Photo: Skagerak